Vol 26 No 2 (2020)
Published: 2020-02-07
Articles
An improved time-cost trade-off model with optimal labor productivity
Abstract 2093 | PDF Downloads 1125 | DOI https://doi.org/10.3846/jcem.2020.11663
Page 113-130
Engineering harmony under multi-constraint objectives: the perspective of meta-analysis
Abstract 1766 | PDF Downloads 782 | DOI https://doi.org/10.3846/jcem.2020.11820
Page 131-146
Classification of construction hazards for a universal hazard identification methodology
Abstract 2992 | PDF Downloads 1729 | DOI https://doi.org/10.3846/jcem.2020.11932
Page 147-159
Time reduction effects of steel connected precast concrete components for heavily loaded long-span buildings
Abstract 1697 | PDF Downloads 616 | DOI https://doi.org/10.3846/jcem.2020.11673
Page 160-174
Assessing construction labours’ safety level: a fuzzy MCDM approach
Abstract 2941 | PDF Downloads 1646 | DOI https://doi.org/10.3846/jcem.2020.11926
Page 175-188
Compressive strength prediction of lightweight short columns at elevated temperature using gene expression programing and artificial neural network
Abstract 2097 | PDF Downloads 854 | DOI https://doi.org/10.3846/jcem.2020.11931
Page 189-199
Bayesian belief network-based project complexity measurement considering causal relationships
Abstract 2090 | PDF Downloads 1021 | DOI https://doi.org/10.3846/jcem.2020.11930
Page 200-215