Share:


Applying metaheuristic strategies in construction projects management

    Wojciech Boejko Affiliation
    ; Zdzisław Hejducki Affiliation
    ; Mieczysław Wodecki Affiliation

Abstract

This work deals with the application of artificial intelligence instruments in a building schedule. In this article there was presented an original optimization scatter search algorithm taking into consideration both technological and organizational restrictions. This algorithm was applied to the real analysis of the industrial building project realization.

Keyword : construction, strategy, metaheuristics, optimization, scheduling

How to Cite
Boejko, W., Hejducki, Z., & Wodecki, M. (2012). Applying metaheuristic strategies in construction projects management. Journal of Civil Engineering and Management, 18(5), 621-630. https://doi.org/10.3846/13923730.2012.719837
Published in Issue
Sep 28, 2012
Abstract Views
800
PDF Downloads
643
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.